AI COMPUTE INFRASTRUCTURE · PLANNED 2027

Dedicated AI compute, built from the power up.

BaseTensor owns and operates GPU clusters for companies that train and serve large models. Reserved, contiguous GPU capacity, sited on long-term contracted power, delivered by one operator.

10 MWIN DEVELOPMENT
IT capacity · Southeast Asia · targeted 2027
50 MWIN DEVELOPMENT
IT capacity · Southeast Asia · targeted late 2027
U.S.IN DEVELOPMENT
Southern U.S. site · capacity and timing to be confirmed
250+ MWTARGET
Total offered capacity across sites · See readiness

The constraint moved. So did we.

The limit on AI capacity is no longer only GPUs. It is contiguous power, land and cooling, delivered on schedule. BaseTensor is built around that constraint.

01

Contiguous scale

Whole clusters, not fragments. Capacity is designed to be reserved in large contiguous blocks by a small number of customers.

02

Power as the foundation

Our infrastructure is sited on long-term contracted power. The advantage comes from the asset, not from a discount.

03

Built for full-rack density

Purpose-built liquid cooling for the highest-density GPU racks, so full-rack training topologies run without de-densifying.

04

One operator, end to end

Power, facility, cluster and operations under one accountable team, with an SLA matched to your roadmap.

High-voltage transmission towers crossing open country at dusk.

From inquiry to reservation in three steps.

The full process →
01

Inquire

Tell us your workload, scale, preferred GPU platform and target start date.

02

Scope

Under NDA we share technical specifications, delivery schedule and commercial terms, and confirm fit.

03

Reserve

A reservation agreement fixes capacity, ramp and term.

PLANNED

Reserving capacity for 2027.

We are opening conversations now with a limited number of qualified institutional and enterprise customers for 2027 capacity.

Request capacity